A.2.01.c1.2.b| No. | Uraian | Kode | Satuan | Koefisien | Harga Satuan (Rp) |
Jumlah Harga (Rp) |
|---|---|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| A | Tenaga Kerja | |||||
| 1 | Pekerja | L.01 | OH | 0,40000 | 133.700,00 | 53.480,00 |
| 2 | Tukang | L.02 | OH | 0,20000 | 181.900,00 | 36.380,00 |
| 3 | Mandor | L.04 | OH | 0,04000 | 212.600,00 | 8.504,00 |
| Jumlah Harga Tenaga Kerja | 98.364,00 | |||||
| B | Bahan | |||||
| Jumlah Harga Bahan | 0,00 | |||||
| C | Peralatan | |||||
| 1 | Stamper Double Drum-550 kg | E25 | Jam | 0,02390 | 84.621,70 | 2.022,46 |
| Jumlah Harga Peralatan | 2.022,46 | |||||
| D | Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) | 100.386,46 | ||||
| E | Biaya Umum dan Keuntungan (15%) x D | 15% x D | 15.057,97 | |||
| F | Harga Satuan Pekerjaan (D+E) | 115.444,43 | ||||