Perencanaan Bendung DI Kedungrejo - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan -
| Nama Proyek | Perencanaan Bendung DI Kedungrejo - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - | Nama Bendung | Bendung Kedungrejo - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Salinan - Sali |
|---|---|---|---|
| Nama Sungai | Sungai Sumberarum | Debit Banjir Q100 | 260,0000 m³/det |
| Lebar Sungai | 45,000 m | Elevasi Dasar Sungai | 85,000 m |
| Elevasi Mercu Rencana | 88,000 m | Tinggi Bendung Awal | 3,000 m |
| Elevasi Lantai Hulu | - | Elevasi Lantai Kolam Olak | - |
| Tipe Mercu | ogee | Status Kapasitas | Memenuhi |
|---|---|---|---|
| Debit Rencana | 260,0000 m³/det | Kapasitas Mercu | 260,0000 m³/det |
| Koefisien Debit Cd | 1,3000 | Tinggi Energi H1/hd | 1,940 m |
| Elevasi Mercu | 88,000 m | Elevasi Muka Air Banjir | 89,940 m |
| B1 Mercu | - | B1 Efektif | - |
|---|---|---|---|
| B2 Mercu | - | B2 Efektif | - |
| B3 Pembilas | - | Bs Efektif | - |
| B Total | - | Be Final | 43,400 m |
| Kp Final | - | Ka Final | - |
Rumus lebar efektif: B = B1 + B2 + B3; B1e = B1 - Ka.H1 - Kp.H1; B2e = B2 - Kp.H1 - Kp.H1; Bs = 0,8 × B3; Be = B1e + B2e + Bs.
| Bentuk Muka Hulu | tegak | A | - |
|---|---|---|---|
| n | - | m | - |
| R1 | - | R2 | - |
| Offset X | - | Offset Y | - |
| Panjang Mercu | 43,400 m | Tinggi Mercu | 0,000 m |
|---|---|---|---|
| Luas Penampang Mercu | 0,000 m² | Volume Beton Mercu | 0,000 m³ |
| Volume Pondasi Mercu | - | Volume Cut-off Hulu + Hilir | - |
| Total Beton Mercu + Pondasi | - | Material Pondasi | Beton bertulang |
| Rasio Pembesian | 80,00 kg/m³ | Berat Pembesian Awal | 0,00 kg |
| Bekisting Hulu | 0,000 m² | Bekisting Hilir | 0,000 m² |
| Bekisting Total Mercu | 0,000 m² | ||
Estimasi quantity pondasi pada laporan ini bersifat awal dan dihitung dari dimensi geometri desain mercu. Volume galian pondasi, lantai kerja, dewatering, waterstop, joint, dan detail pembesian perlu dihitung lebih lanjut pada modul quantity/RAB.